Ardex K15 Rapid Setting Levelling Compound
search
  • Ardex K15 Rapid Setting Levelling Compound

Ardex K15 Rapid Setting Levelling Compound

Ardex K15 Rapid Setting Levelling Compound

ARDEX K 15 MICROTEC is a highly versatile self-levelling compound designed to meet the demands of modern flooring installations. Engineered with advanced MICROTEC technology, it is compatible with a wide variety of substrates, including concrete, cementitious screeds, timber, and more. This flexibility makes it an excellent choice for both commercial and residential projects.

SCRK15-20
New product
Available instore or CALL 1300 KEVMOR
 Customer ratings and reviews
  • All Products in Stock in Australia
  • FREE SHIPPING ON MOST ONLINE ORDERS OVER $100

Ardex K15 Rapid Setting Levelling Compound

ARDEX K15 Microtec is extremely versatile, is suitable for a wide range of substrates and is able to receive virtually any floor covering in 16 to 18 hours.

Where to use:

ARDEX K15 Microtec is extremely versatile, is suitable for a wide range of substrates and is able to receive virtually any floor covering in 16 to 18 hours.  

Application Examples:

  • New and existing concrete
  • Rain damaged concrete which has been mechanically prepared
  • Levelling over existing concrete, terrazzo, ceramic, quarry tiles or epoxy coatings
  • Steel decking (contact ARDEX Technical Services)
  • Timber floors (contact ARDEX Technical Services)
  • Damp or moisture vulnerable concrete when used in conjunction with an ARDEX moisture control system

Technical Characteristics:

  • Internal use only
  • Hardens quickly and achieves high early strength
  • Will not shrink or spall, even when applied in tick layers
  • Formulated with high flow properties, remaining fluid even for applications requiring 3mm or less to provide a durable, flat, smooth floor finish
  • Suitable floorcoverings linoleum, vinyl, carpet, ceramic and quarry tiles and timber – parquetry and floating

Specifications:

  • Colour: grey
  • Workability time: 20-30 minutes
  • Set to light foot traffic: approx. 3 hours.
  • Waiting time before laying: 16 hours
  • Consumption: 1.5 kg/m² per mm of thickness.
  • Bag size: 20 kg

You might also like